powered by engineers

Latest News

  • Rig Condition Survey - SS Shelf 1 & SS Shelf 3

    01 Feb 2016

    Rig type: Midwater Floater Semi-Submersible Name: Shelf 1; Shelf 3 Class:Russian Maritime Register of Shipping (RS) Scope:  Rig condition survey Date: November, 2015 Client: SOCAR - State Oil Company of Azerbaijan Republic As per client required during November...

  • Redesign of Subsea Hydraulic Stab

    21 Sep 2015

    GOE team proudly presents the new, effective design of subsea hydraulic stab. The Subsea Hydraulic Stab is designed to connect/operate three hydraulic inline connections at the same time. Stab is equipped emergency fail safe release system. ...

  • Feasibility study for Halliburton Pride

    29 May 2015

    GOE project management have completed feasibility study for upgrading of Multipurpose Offshore Construction vessel – Halliburton Pride, currently named Micoperi Pride (Built –Davie 717). This study analyses three different options for upgrading and modif...

  • Tere Moana - Full Condition Survey

    18 May 2015

    GOE surveyor team conducted full condition survey of Tere Moana Passenger Vessel for Grand Circle Cruise Company. During the survey all currently available compartments and vessel capital equipment were visually inspected and photographed. All data taken from vessel were used a...