Projects

Redesign of Subsea Hydraulic Stab

21 Sep 2015

GOE team proudly presents the new, effective design of subsea hydraulic stab. The Subsea Hydraulic Stab is designed to connect/operate three hydraulic inline connections at the same time. Stab is e...

Subsea diver less hydraulic operated pipeline lifting-positioning tool

27 Feb 2015

The Pipeline Lifting / Positioning Tool is designed to be used in light weight system to lift pipeline from seabed. The tool can be operated by divers in shallow water applications by using hydraulic...

Design of operation philosophy for Universal Subsea Support Vessel

26 Feb 2015

The Universal Subsea Support Vessel (USSV) is a new breed of modern supply vessel ideal for support of any offshore activity. The v...

Zero discharge rig floor design

26 Feb 2015

Gusto Pelican class Drill Ships are designed with very low height between moon-pool cellar deck and diverter housing what require BOP running operation to be carry out ...

Design for BOP Frame Cameron U-type BOP 18 ¾ 10 K system

26 Feb 2015

The deep venture BOP frame was built to support the Cameron 4Ram 10M BOP stack in Cape Town in 2007. The main frame structure consists of four parts: upper LMRP frame,...

Cargo stabiliser system for knuckle crane

26 Feb 2015

CSU is tool specially designed for use on offshore cranes to facilitate easier cargo handling from vessel to stationary platforms. Although unit is primarily designed t...

Subsea diver less hydraulic operated High Flow hydraulic stab

26 Feb 2015

The Subsea hydraulic stab is a hydraulic connector designed to connect and operate three hydraulic inline connections at the same time. It is also includes an emergency...

Equipment Overhauling

26 Feb 2015

GOE has experience within overhauling, testing, installation and commissioning of complete drilling packages for rig operators. GOE performs overhauling of drilling eq...

Equipment Production

25 Feb 2015

GOE is recognised company for innovative and efficient subsea technologies and equipment production. Rapid development of new technologies and their mass availability,...

Design & Engineering

25 Feb 2015

Training and education services

25 Feb 2015

At GOE, we understa...

Shore base services

25 Feb 2015

GOE employs experien...

Crew Management

25 Feb 2015

Rig repairs & maintenance services

24 Feb 2015

GOE’s extensive exp...

Marine warranty services

24 Feb 2015

GOE provides in...

Rig moving services

24 Feb 2015

The process of every rig move is documented in a rig move manual, comprising site visits, road inspections, resource planning, procedures including 3D drawings and pict...

Full Rig Condition Surveys

24 Feb 2015

G...

DS Deep Venture

21 Jan 2015

DS Peregrine 1

21 Jan 2015

CLIENT: Norscot/ Gryphon Energy LOCATION: Singapore YEAR: 2014 – work in progress Peregrine 1 (ex. Mikhail Mirchink) is diesel electric drill ship built i...

JU Murmanskaya

21 Jan 2015

Noble Globetrotter II

21 Jan 2015

CLIENT: Noble Drilling LOCATION: Netherlands Drill ship, Noble Globetrotter I, was built 1989 by STX Shipbuilding & Huisman. The ship was designed for drilling depth to 40,000 ft, and water de...

Noble Globetrotter I

21 Jan 2015

SS Petrolia

21 Jan 2015

Subsea diver less hydraulic operated pipeline repair connector

20 Jan 2015

The P&N Diver-Less Connectors are designed and prepared for pipe from 3 inch OD to a maximum 21 inch OD, with a pressure rating according to our customer`s requests...

Subsea diverless high flow stab

20 Jan 2015

The Subsea Hydraulic Stab is hydraulic connector designed to connect/operate three hydraulic inline connections in the same time. It’s also designed with emergency fa...

Subsea diver less hydraulic operated pipeline lifting-positioning tool

20 Jan 2015

The Pipeline Lifting / Positioning Tool is designed to be used in light weight system to lift pipeline from seabed. The tool can be operated by divers in shallow water...

Project Management

08 Jan 2015