News archive

Rig Condition Survey – SS Shelf 1 & SS Shelf 3

01 Feb 2016

Rig type: Midwater Floater Semi-Submersible Name: Shelf 1; Shelf 3 Class:Russian Maritime Register of Shipping (RS) Scope:  Rig condition survey Date: November, 2015 Client: SOCAR - State Oil Co...

Redesign of Subsea Hydraulic Stab

21 Sep 2015

GOE team proudly presents the new, effective design of subsea hydraulic stab. The Subsea Hydraulic Stab is designed to connect/oper...

Feasibility study for Halliburton Pride

29 May 2015

GOE project management have completed feasibility study for upgrading of Multipurpose Offshore Construction vessel – Halliburton Pride, currently named Micoperi Pride (Built –Davie 717).

Derrick upgrade from 1M to 1.3 M lbs

26 Feb 2015

As per client request GOE was entrusted with structural analysis to determine possibility to upgrade existing derrick structure from 1M to 1,3M lbs on DP DS “Deep Ven...

Full Rig Condition Surveys of DS Discoverer Seven Seas

26 Feb 2015

GOE survey team boarded Discoverer Seven Seas in Vietnamese Sea on 30.11.2014, after passing safety induction was received by their host  from Transocean. GOE team was...

Subsea Hydraulic Stab

26 Feb 2015

GOEs' design and engineering department successfuly concluded design, engineering and drafting of Subsea Hydraulic Stab as required by Halliburton. After design approve...

Dry Tow JU – Endeavour Spirit of Independence

12 Mar 2014

Dry Tow JU – Endeavour Spirit of Independence from Homer (AL) to Saldanha (SAR) GOE Project team was contracted to perform rig preparation for loading onto ...