Engineering Design Projects

Redesign of Subsea Hydraulic Stab

21 Sep 2015

GOE team proudly presents the new, effective design of subsea hydraulic stab. The Subsea Hydraulic Stab is designed to connect/operate three hydraulic inline connections at the same time. Stab is e...

Subsea diver less hydraulic operated pipeline lifting-positioning tool

27 Feb 2015

The Pipeline Lifting / Positioning Tool is designed to be used in light weight system to lift pipeline from seabed. The tool can be operated by divers in shallow water applications by using hydraulic...

Design of operation philosophy for Universal Subsea Support Vessel

26 Feb 2015

The Universal Subsea Support Vessel (USSV) is a new breed of modern supply vessel ideal for support of any offshore activity. The v...

Zero discharge rig floor design

26 Feb 2015

Gusto Pelican class Drill Ships are designed with very low height between moon-pool cellar deck and diverter housing what require BOP running operation to be carry out ...

Design for BOP Frame Cameron U-type BOP 18 ¾ 10 K system

26 Feb 2015

The deep venture BOP frame was built to support the Cameron 4Ram 10M BOP stack in Cape Town in 2007. The main frame structure consists of four parts: upper LMRP frame,...

Cargo stabiliser system for knuckle crane

26 Feb 2015

CSU is tool specially designed for use on offshore cranes to facilitate easier cargo handling from vessel to stationary platforms. Although unit is primarily designed t...

Subsea diver less hydraulic operated High Flow hydraulic stab

26 Feb 2015

The Subsea hydraulic stab is a hydraulic connector designed to connect and operate three hydraulic inline connections at the same time. It is also includes an emergency...

diver assisted pipeline repair clamp 26″

08 Jan 2015

This type of clamp is used as a temporarily solution for leaking 26ʺ pipes, where the leak is coming on the tube and not at the junction of pipes. Here we use screws and cylinders that are located o...

Umbilical Repair Tooling Package

08 Jan 2015

The Umbilical Repair tooling Package - URTP in conjunction with STOPAQ Casing Filler is designed for best corrosion resistance repair on existing umbilical repair tasks. The main purpose is to crea...

Umbilical repair split type connection

08 Jan 2015

The Umbilical Repair tooling Package - URTP in conjunction with STOPAQ Casing Filler is designed for best corrosion resistance repair on existing umbilical repair tasks. The main purpose is to create...

pipeline connection tension clamp 6″

08 Jan 2015

This specially designed clamp eliminates the need to replace bolts on flanged connections. When the clamp is mounted on a flange connection, having performed its tightening it stays on the spot, wh...

PIPELINE CONNECTION SAFETY CLAMP 6″

08 Jan 2015

This type of clamp can be used as a temporarily solution, and have different design from a repair clamp. Main purpose of this clamp is to transfer the load from bolts to clamp teeth (it does not ha...

Sea-bed Transporter

08 Jan 2015

This diverless cement block transporter, serves to set up cement block under the deep-water pipeline. When this transporter is lowered on sea bed, it starts with walking operations and installation o...

Pipeline Lifting Tool with cement block manipulator

08 Jan 2015

This type of lifting tool is used up to depth of 4000 meters. Main purpose is placing cement blocks under pipeline for stability, and can operate with pipes of different dimensions. This Tool also i...

Stab Connectors

08 Jan 2015

The Stab connectors are hydraulic connectors designed to connect / operate three hydraulic function in same time. They have 3 (three) operating actuators with large piston area which create high hy...

Flange Tension Tool

07 Jan 2015

Flange Tension Tool (FTT) is designed for flange bolts replacement without stopping process plant or operation what mean to carry out flange bolts replacement with pipe under working pressure.